The Swedish Defense Recruitment Agency- fitness test with bike
Sound five: A fitness test performed with a stationary bike. The test goes on for about ten minutes while the pressure gradually…

Sounds recorded at the place where treated sewage goes into the measuring chamber, just before it is discharged into the Drwina River. The parameters of treated sewage meet national and EU standards.
The recording was made at the Płaszów Sewage Treatment Plant. This is one of two mechanical-biological treatment plants belonging to Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji S.A. in Krakow. The sewage treatment plant in Płaszów serves around 500,000 inhabitants and treats an average of 165,000 m3 of sewage per day.
First, the sewage is pre-treated mechanically: solid impurities are retained on coarse and fine grids, sand is removed in a sand trap, sediment settles in the primary settling tanks. Mechanically treated sewage is channelled to biological reactors where the processes of removing organic compounds, nitrogen and phosphorus using the biomass of bacteria, protozoa and higher organisms (the so-called activated sludge) take place. Then they go to secondary settling tanks where active sludge is separated from the treated sewage. Sewage which has been treated and is now safe for the ecosystem is discharged into the Drwina River. Sludge from the purification process is used to produce biogas which powers electricity generators. Finally, after dewatering the sludge is incinerated at the Sludge Thermal Treatment Station.
The information comes from: https://osplaszow.wkraj.pl/#/62657/0
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
Sound five: A fitness test performed with a stationary bike. The test goes on for about ten minutes while the pressure gradually…
Water closet from the 1940s, located in the textile fabric Göteborgs Remfabrik. Original porcelain, seat and flush device. Recorded by Magdalena Åkerström.…
The electric hand welding machine from the 1920s welds single chain links together. The welder must place a “U” shaped chain link…
The sound of welding. Before the electroslag remelting (ESR) process starts, a consumable wire electrode is first welded to a special holder…