Krakow settling tank sewage treatment plant

The sewage treatment plant (9): primary settling tanks

Sounds recorded above the primary settling tank. It is one of four round tanks in which the last stage of mechanical treatment takes place, i.e. separation of solids from liquids. Sediment sinks to the bottom (sedimentation) and fats float to the surface (flotation). One portion of sewage goes through the settling tank in about 1 hour.

The recording was made at the Płaszów Sewage Treatment Plant. This is one of two mechanical-biological treatment plants belonging to Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji S.A. in Krakow. The sewage treatment plant in Płaszów serves around 500,000 inhabitants and treats an average of 165,000 m3 of sewage per day.

First, the sewage is pre-treated mechanically: solid impurities are retained on coarse and fine grids, sand is removed in a sand trap, sediment settles in the primary settling tanks. Mechanically treated sewage is channelled to biological reactors where the processes of removing organic compounds, nitrogen and phosphorus using the biomass of bacteria, protozoa and higher organisms (the so-called activated sludge) take place. Then they go to secondary settling tanks where active sludge is separated from the treated sewage. Sewage which has been treated and is now safe for the ecosystem is discharged into the Drwina River. Sludge from the purification process is used to produce biogas which powers electricity generators. Finally, after dewatering the sludge is incinerated at the Sludge Thermal Treatment Station.

The information comes from: https://osplaszow.wkraj.pl/#/62657/0


Sound recording: Monika Widzicka
Photo: Piotr Żabicki

Specs:

Decade:
Filesize:
Duration:
Channels:
2010s
22.7 MB
59 s
2 (Stereo)
Sample rate:
Bit rate:
Bit depth:
96 kHz
3072 kb/s
16 bit

Recorded on July 25, 2019
Płaszów Sewage Treatment Plant
Krakow, POLAND
Creative Commons License