Work at the tram depot – shunting the truck
Sounds of everyday life of the tram depot hall. The recording features the shunting and moving by crane of a tramcar truck…

Sounds recorded above the primary settling tank. It is one of four round tanks in which the last stage of mechanical treatment takes place, i.e. separation of solids from liquids. Sediment sinks to the bottom (sedimentation) and fats float to the surface (flotation). One portion of sewage goes through the settling tank in about 1 hour.
The recording was made at the Płaszów Sewage Treatment Plant. This is one of two mechanical-biological treatment plants belonging to Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji S.A. in Krakow. The sewage treatment plant in Płaszów serves around 500,000 inhabitants and treats an average of 165,000 m3 of sewage per day.
First, the sewage is pre-treated mechanically: solid impurities are retained on coarse and fine grids, sand is removed in a sand trap, sediment settles in the primary settling tanks. Mechanically treated sewage is channelled to biological reactors where the processes of removing organic compounds, nitrogen and phosphorus using the biomass of bacteria, protozoa and higher organisms (the so-called activated sludge) take place. Then they go to secondary settling tanks where active sludge is separated from the treated sewage. Sewage which has been treated and is now safe for the ecosystem is discharged into the Drwina River. Sludge from the purification process is used to produce biogas which powers electricity generators. Finally, after dewatering the sludge is incinerated at the Sludge Thermal Treatment Station.
The information comes from: https://osplaszow.wkraj.pl/#/62657/0
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
Sounds of everyday life of the tram depot hall. The recording features the shunting and moving by crane of a tramcar truck…
A big change is on its way within the field of commercial radio transmissions. The old analog radio transmissions is being replaced…
Recorded inside the headframe of the mine Gröndalsgruvan in the Klackberg mining fields. This Atlas compressor provided compressed air to drilling equipment…
The sound of ship’s bell on the icebreaker “Kuna”. The recording was realized on board of the museum and training ship “Kuna”…