IBM PS/1 start
IBM PS/1 The original PS/1, based on a 10 MHz Intel 80286 CPU, was designed to be easy to set up and…

Soundscape recorded in the hall of the treated water pumping station.
A set of pumps and auxiliary devices suck treated water from collecting wells and pump it into the municipal water system under pressure guaranteeing its proper operation. There are six pump sets in the hall with different capacities, valves, pipeline deaeration equipment and hydraulic equipment for eliminating water hammers.
The recording was made at the Rudawa Water Treatment Plant, which is part of Krakow waterworks. The water intake is located on the Rudawa River, the left tributary of the Vistula. The raw water from the intake is subjected to a treatment process which consists of oxidation, coagulation, sedimentation, filtration and disinfection. ZUW Rudawa is one of four treatment plants that provide drinking water for Krakow. Tap water in Krakow is of high quality and good for drinking. Its parameters are monitored on an ongoing basis by the Central Laboratory of Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji in Krakow. ZUW Rudawa produces an average of 22,000 - 28,000 m3 of water per day and supplies about 200,000 inhabitants.
The information comes from: https://zuwrudawa.wkraj.pl/#/64541/0
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
IBM PS/1 The original PS/1, based on a 10 MHz Intel 80286 CPU, was designed to be easy to set up and…
Brick production was of great importance in the Lippe area in Germany. The Brick Factory Beerman in Sylbach was one of the…
Recording of the sound landscape in the main repair hall at Wola Duchacka bus depot in Krakow. Buses undergoing repairs and servicing…
This metal lathe is an old, but very reliable, piece of mechanical machinery. It is thought to have been installed in the…